Skip to main content
part of KNAUF INSULATION
  • About
  • Career
  • News

UK

Choose another country

  • Corporate Corporate
  • Albania Albania
  • Algeria Algeria
  • Australia Australia
  • Austria Austria
  • Belgium Belgium
  • Bosnia Bosnia
  • Bulgaria Bulgaria
  • Canada Canada
  • China China
  • Croatia Croatia
  • Czech Republic Czech Republic
  • Denmark Denmark
  • Estonia Estonia
  • Finland Finland
  • France France
  • Germany Germany
  • Greece Greece
  • Hungary Hungary
  • Ireland Ireland
  • Italy Italy
  • Japan Japan
  • Latvia Latvia
  • Lithuania Lithuania
  • Luxembourg Luxembourg
  • Macedonia Macedonia
  • Mexico Mexico
  • Montenegro Montenegro
  • Morocco Morocco
  • Netherlands Netherlands
  • New Zealand New Zealand
  • Norway Norway
  • Poland Poland
  • Portugal Portugal
  • Romania Romania
  • Russia Russia
  • Serbia Serbia
  • Singapore Singapore
  • Slovakia Slovakia
  • Slovenia Slovenia
  • South Korea South Korea
  • Spain Spain
  • Sweden Sweden
  • Switzerland Switzerland
  • Tunisia Tunisia
  • Turkey Turkey
  • UAE UAE
  • UK UK
  • Ukraine Ukraine
  • USA USA
Home
  • Home
  • About
  • Contact
  • Newsletters
  • Sitemap
  • Cookies

Search

  • Products
  • Solutions
  • Design
  • Downloads
  • Case Studies
  • Press Releases
  • Videos
  • News
  • More

You are here

  • Home
  • Case Studies
  • Royal Shakespeare Theatre
  • City West Housing Trust
  • The Queen's Terminal - Heathrow Airport T2
  • Center Parcs (Woburn Forest Village)
  • European Bioenergy Research Institute (EBRI)
  • Alumet HQ
  • Marks and Spencer, Cheshire Oaks
  • Birmingham Control Tower
  • Birmingham City University
  • St Vincent de PAUL, Newcastle
  • Dublin Airport, Ireland
  •  
  • 1 of 3
  • next ›

Royal Shakespeare Theatre

30th September 2009
Products used: 
Earthwool FactoryClad Roll
Client: 
Royal Shakespeare Company
Main contractor: 
Mace Group
KI Project Manager: 
Craig O'Donnell
Architect: 
Bennett Associates

CHALLENGE

Work is underway to create a new theatre that will transform the existing 1932 Royal Shakespeare Theatre whilst retaining the original Art Deco and Victorian elements of the building. Due for completion during 2010, the theatre will give artists and audiences alike the best environment in which to perform and enjoy Shakespeare with improved public spaces both inside and surrounding the theatre.

The challenge for the project design is to blend the key aspects of the existing buildings with the new theatre designs. Specialist roofing contractor, Varla (UK) Limited were awarded the contract to design, manufacture and install the zinc standing seam roof and wall package. Varla (UK) Limited challenged Knauf Insulation to propose a solution to meet the demanding specification for this unique project.


SOLUTION

Shakespeare TheatreKnauf Insulation provided detailed ongoing technical support during the design stages of the project and proposed solutions based on the results of unique three dimensional heat loss calculations. The unique 3-D calculation support service, provided by the Technical Advisory Centre, was an integral part of the product specification process to ensure that the exact thickness recommendations were proposed in order to meet the project’s specific U-value requirements.

Knauf Insulation were able to provide a solution that met all of Varla’s insulation requirements by using 160mm of FactoryClad 32 roll. This is a flexible, lightweight roll of resilient glass mineral wool with exceptionally high tear strength and a thermal conductivity of just 0.032 W/mK.

In addition, FactoryClad, recommended for this project, is manufactured from glass mineral wool, which is ideal for limiting the spread of fire since it holds a Euroclass classification A1 for non-combustibility. The product will not burn, will not give off toxic smoke nor will it suddenly ignite in a fire due to ‘flashover’. For public buildings such as this, superior fire performance is crucial.

Shakespeare TheatreShakespeare Theatre

 


Download PDF of this case study

ECOSE® Technology

ECOSE® Technology is a revolutionary, no added formaldehyde binder technology

From Twitter

Tweets by @KnaufUK

Quick Contact

Technical Advice

01744 766666

technical.uk@knaufinsulation.com

Customer Service

0844 800 0135

sales.uk@knaufinsulation.com

General

08700 668660

More contact information

Quick links

  • Insulation Talk Newsletter
  • Home
  • Insulation Solutions Manual
  • Glass Mineral Wool Rolls
  • Contact Us
  • Glass Mineral Wool Slabs
  • Sustainability
  • Rock Mineral Wool Slabs
  • CAD & NBS
  • Fire Protection
  • About Us
  • Privacy Policy
  • Legal
  • Sitemap
  • Insurance
  • Links

Visit also

  • Space Insulation

    High-performance DIY loft insulation

  • Thinkinsulation.com

    thinkinsulation.com is a source of clear and practical advice on energy efficiency.

More links

Stay Informed

  • Newsletter
  • Linkedin
  • Youtube
  • Twitter
  • Google