Skip to main content
part of KNAUF INSULATION
  • About
  • Career
  • News

UK

Choose another country

  • Corporate Corporate
  • Albania Albania
  • Algeria Algeria
  • Australia Australia
  • Austria Austria
  • Belgium Belgium
  • Bosnia Bosnia
  • Bulgaria Bulgaria
  • Canada Canada
  • China China
  • Croatia Croatia
  • Czech Republic Czech Republic
  • Denmark Denmark
  • Estonia Estonia
  • Finland Finland
  • France France
  • Germany Germany
  • Greece Greece
  • Hungary Hungary
  • Ireland Ireland
  • Italy Italy
  • Japan Japan
  • Latvia Latvia
  • Lithuania Lithuania
  • Luxembourg Luxembourg
  • Macedonia Macedonia
  • Mexico Mexico
  • Montenegro Montenegro
  • Morocco Morocco
  • Netherlands Netherlands
  • New Zealand New Zealand
  • Norway Norway
  • Poland Poland
  • Portugal Portugal
  • Romania Romania
  • Russia Russia
  • Serbia Serbia
  • Singapore Singapore
  • Slovakia Slovakia
  • Slovenia Slovenia
  • South Korea South Korea
  • Spain Spain
  • Sweden Sweden
  • Switzerland Switzerland
  • Tunisia Tunisia
  • Turkey Turkey
  • UAE UAE
  • UK UK
  • Ukraine Ukraine
  • USA USA
Home
  • Home
  • About
  • Contact
  • Newsletters
  • Sitemap
  • Cookies

Search

  • Products
  • Solutions
  • Design
  • Downloads
  • Case Studies
  • Press Releases
  • Videos
  • News
  • More

You are here

  • Home
  • Case Studies
  • Doncaster Lakeside Stadium
  • City West Housing Trust
  • The Queen's Terminal - Heathrow Airport T2
  • Center Parcs (Woburn Forest Village)
  • European Bioenergy Research Institute (EBRI)
  • Miller Homes
  • Alumet HQ
  • Marks and Spencer, Cheshire Oaks
  • Birmingham Control Tower
  • Birmingham City University
  • St Vincent de PAUL, Newcastle
  •  
  • 1 of 4
  • next ›

Doncaster Lakeside Stadium

9th August 2007
Products used: 
Earthwool DriTherm Cavity Slabs
Polyfoam ECO Floorboard
Client: 
Doncaster City Council
Project: 
Lakeside Stadium
Main contractor: 
Carillion
KI Project Manager: 
James Hulbert
Architect: 
Ian Martin-Harvey at ACP

CHALLENGE

The 15,000 capacity Lakeside Stadium complex is a £28 million project initiated by Doncaster City Council and is due for completion in December 2006. After that, the sports stadium will be home to Doncaster Rovers FC, Doncaster Belles FC and the newly renamed Doncaster Lakers RLFC.

The entire stadium project needed to comply with Part L2 of the latest building regulations regarding thermal and acoustic insulation and fire retardation. As well as sealing in crowd noise and providing fire protection for large areas of the terraces, spectators also needed to be protected from isolated cold spots occurring at the venue.

The stadium’s architects, Carillion needed impartial insulation advice, as well as a broad range of options regarding suitable products.


SOLUTION

Doncaster Lakeside StadiumKnauf Insulation’s on-site advisor was able to draw up a complete product specification for the stadium as a whole. To tackle both the cold spot problem and to reduce noise, Knauf Insulation supplied 317m2 of Polyfoam Floorboard Standard and Polyfoam Floorboard Extra and this was installed throughout the stadium. Polyfoam Floorboard is a high performance, versatile XPS rigid board, suitable for floor, wall and roof applications. Although lightweight, it is extremely strong, thermally efficient and moisture resistant.

A total of 2500m2 of Crown DriTherm 85mm was supplied for use in the cavity walls, which is a massive 70 per cent of the total stadium area. Crown DriTherm is a rigid slab of glass mineral wool with a water-repellent additive. It is dimensioned to fit between wall ties at standard spacings and is ideal for the thermal insulation of masonry cavity external walls, either partially filling or fully filling the cavity.

For insulation and fire protection of large areas under the terraces, Knauf Insulation worked with its sister company, Knauf Drywall. A specification was reached featuring 40mm of Rocksilk Universal Slab RS60 and100mm of Rocksilk Universal Slab RS33. This is an unfaced rock mineral wool, multi-purpose slab for use in a variety of applications. Rocksilk Universal Slab operates to Euroclass A1 fire standard and can be used up to continuous operating temperatures of 850°C.

 Doncaster Lakeside Stadium

ECOSE® Technology

ECOSE® Technology is a revolutionary, no added formaldehyde binder technology

From Twitter

Tweets by @KnaufUK

Quick Contact

Technical Advice

01744 766666

technical.uk@knaufinsulation.com

Customer Service

0844 800 0135

sales.uk@knaufinsulation.com

General

08700 668660

More contact information

Quick links

  • Insulation Talk Newsletter
  • Home
  • Insulation Solutions Manual
  • Glass Mineral Wool Rolls
  • Contact Us
  • Glass Mineral Wool Slabs
  • Sustainability
  • Rock Mineral Wool Slabs
  • CAD & NBS
  • Fire Protection
  • About Us
  • Privacy Policy
  • Legal
  • Sitemap
  • Insurance
  • Links

Visit also

  • Space Insulation

    High-performance DIY loft insulation

  • Thinkinsulation.com

    thinkinsulation.com is a source of clear and practical advice on energy efficiency.

More links

Stay Informed

  • Newsletter
  • Linkedin
  • Youtube
  • Twitter
  • Google